Project new Recovery Boiler

PROSWECO was hired by a European mill to follow the manufacturing and erection of their new 2100 Tds/24h Recovery Boiler. In total, 6 audits were conducted in various workshops, 4 erection audits were carried out on site along with a check out visit after completion of boiler erection. PROSWECO also assisted the client with proposal review in this major project. Since start-up the boiler has had one outage, during which PROSWECO was hired for annular boiler inspection. 

Contact us

Contact us

  • This field is for validation purposes and should be left unchanged.