In situ overlay welding of Alloy 625
In situ weld overly of power boiler tubes with Alloy 625 from proposal to finished project through setting of requirements (requirement review), visual inspection, XRF, QA/QC, in close collaboration with contractor and end client has been performed by our engineers. The result of the 866m2 was satisfactory. Contact us for further information.
Contact us